Kalamazoo River Erosion Sites
 
Site 22 July 10, 2003July 10, 2003
 

Click map image to see a larger view.

Site Number
Location
Soil Type
Length of Erosion (feet)
Height of Erosion (feet)
Apparent Cause of Erosion
Sediment Loading (tons/year)
Phosphorus Loading (pounds/year)
22
Kalamazoo County, upstream of King Highway bridge
gravel and fill
100
10
moderate vehicle access
1.7
1.3
Railroad remediation with boom.

Return to July 10, 2003 trip.

Next site.

Previous site.

Site 1Site 2