Kalamazoo River Erosion Sites
Site 22
Click map image to see a larger view.
Site Number
Location
Soil Type
Length of Erosion (feet)
Height of Erosion (feet)
Apparent Cause of Erosion
Sediment Loading (tons/year)
Phosphorus Loading (pounds/year)
22
Kalamazoo County, upstream of King Highway bridge
gravel and fill
100
10
moderate vehicle access
1.7
1.3
Railroad remediation with boom.
Return to July 10, 2003 trip.
Next site.
Previous site.